A/B TESTING WORKSHEET Space Office | 2026-10-13 Companion guide: https://www.spaceoffice.ai/blog/a-b-testing Use this planning aid for one decision. It does not replace a statistical design review. Mark unknowns rather than inventing data or permissions. 1. DECISION AND EVIDENCE Experiment name / version: Human decision owner: Implementation owner: Analyst / analysis reviewer: Current customer problem: Approved evidence, source dates, audience, and limitations: Decision the experiment should inform: Hypothesis: For [eligible audience], changing [experience] will change [defined outcome], because [reason grounded in evidence]. What would make us reject or revise this hypothesis? 2. AUDIENCE AND VERSIONS Eligibility and exclusions (set before launch): Assignment unit (person, account, or other justified unit): Stable identifier and repeat-visit behavior: Allocation to control A / variation B: Control A, screenshot / version reference: Variation B, screenshot / version reference: Exact difference between versions: Exposure event and timestamp: Other experiments or releases affecting this audience: 3. MEASUREMENT One primary outcome: Numerator: Denominator: Observation window per assigned unit: Deduplication / bot / test-account rules: Data source and event definitions: Guardrails, harm thresholds, and response owner: Diagnostic metrics (separate from the primary decision): Multiple-comparison handling, if applicable: 4. SAMPLE AND ANALYSIS PLAN Historical baseline and comparable period: Business improvement needed to justify the change: Minimum detectable effect (MDE), with units: Relative effect or absolute percentage points? State explicitly: Analysis method and platform configuration: Power / significance / confidence settings, as applicable: Required sample per version and calculation record: Expected new eligible units per week: Estimated enrollment duration: Relevant business cycles: Additional time for final participants' outcomes to mature: Planned stopping rule and final analysis point: Safety / instrumentation stop rules (separate from declaring success): Feasibility decision and analyst approval: 5. LAUNCH CHECKS [ ] Current offer facts and proposed wording approved [ ] Both versions work across relevant devices and accessibility paths [ ] Eligibility, random allocation, and stable assignment checked [ ] Exposure and conversion events verified in both versions [ ] Duplicate, failed, and delayed events checked [ ] Required access and permitted account actions confirmed [ ] Sample ratio mismatch check and owner identified [ ] Guardrail monitoring and rollback path ready [ ] Experiment plan, screenshots, and configuration saved [ ] Human launch approval recorded 6. RESULTS (AFTER THE PLANNED ANALYSIS POINT) Analysis date / complete observation window: Assignment and instrumentation quality findings: Material incidents, outages, or other changes: A eligible units: A primary outcomes: A rate = A outcomes / A eligible units: B eligible units: B primary outcomes: B rate = B outcomes / B eligible units: Absolute difference = B rate - A rate: Relative change = (B rate - A rate) / A rate: If A rate is zero, relative change is undefined. Do not divide by zero. Uncertainty interval, units, method, and adjustments: Guardrail outcomes: Prespecified conclusion: Exploratory observations (label separately): Important limitations: 7. HUMAN DECISION Roll out / revise / keep current version / investigate data / other: What does the evidence support? What remains uncertain? Practical benefits, costs, and possible harm: Reason for the decision: Human approver and date: Implementation / rollback owner: Follow-up date and monitoring: Next research question, if needed: FICTIONAL ARITHMETIC EXAMPLE A: 500 requests from 10,000 people = 5.0%. B: 550 requests from 10,000 people = 5.5%. Absolute difference: +0.5 percentage points. Relative difference: +10%. Simple unadjusted normal-approximation 95% interval for the absolute difference: about -0.12 to +1.12 percentage points. This includes zero; the example does not establish a positive effect at that threshold. All example numbers are fictional, not customer results or a forecast. Different analysis methods and adjustments can produce different intervals.